Quick contact info

For over 33 years Salazar Construction has been a national leader of innovative concrete construction techniques, solutions and customer satisfaction. Creativity and expertise to deliver efficient, cost-effective building solutions drives Salazar Construction.

icon_widget_image Monday-Friday: 8am to 5pm icon_widget_image 26306 Diamond Pl. Ste 100 Santa Clarita, CA 91350 icon_widget_image Off.+1 (661) 291.1888 Fax. +1 (661) 291.1882 icon_widget_image info@salzarconstruction.net projects@salazar.felipepeinado.com
Image Alt
Explore the Features

Testimonials

Venenatis faucibus. Nullam quis ante. Etiam sit amet orci eget eros faucibus im tincidunt. Duis leo. Sed fringilla mauris sit amet nibh. Donec sodales sagittis eo magna. Sed consequat, leo eget bibendum sodales, augue velit. Aliquam lorem.

Architect

Philip Larson

Maecenas tempus, tellus eget condimentum rhoncus, sem quam semper libero, sit amet adipiscing sem neque sed ipsum. Nam quam nunc, blandit vel, luctus pulvinar, hendrerit id, lorem. Maecenas nec odio et ante. Cum sociis Theme done.

Interior Designer

Jean Scott

Aliquam lorem ante, dapibus in, viverra quis, feugiat a, tellus. Sociis viverra nulla ut metus varius laoreet. Quisque rutrum. Aenean cum imperdi. Etiam ultricies nisi vel augue. Curabitur ullamcorper ultricies nisi. Nam eget. Maecenas necodio.

Account Manager

Brian Perry

Engineering Manager

Jim Libbe

The quality of concrete placed at OMP Storage consistently exceeded the design requirements. With the flexibility of on-site batching, TechniCON reacted to our demands on short notice and we met a demanding schedule of placing 80,000 cubic yards of varius mix designs in eight months.

Senior Project Director

Dick Miller

“ Your on-site concrete batch plant gave is tight control over the quality, quantity and scheduled placement rate. Also, your proposed 4,000 psi mix cured within the estimated time (16 hours actually) and allowed the plant to startup ahead of schedule. In 55 days, we accomplished the fastest-ever replacement of four steam generators and a reactor head - eight days less than the previous record.”

Project Superintendent

McShane Company

Your on-site concrete batch plant gave is tight control over the quality, quantity and scheduled placement rate. Also, your proposed 4,000 psi mix cured within the estimated time (16 hours actually) and allowed the plant to startup ahead of schedule. In 55 days, we accomplished the fastest-ever replacement of four steam generators and a reactor head - eight days less than the previous record.